Quick Answer: What Should A Control Plan Contain?

What is a control plan?

A control plan is a document describing the critical to quality characteristics, the critical Xs or Ys, of the part or process.

Through this system of monitoring and control, customer requirements will be met and the product or process variation will be reduced.

Each part or process must have a control plan..

How do you complete a control plan?

What are the steps in setting up a Process Control Plan?Set up a multi-functional group. … Review and confirm the flow chart. … Review and confirm special characteristics. … Review and confirm the control method. … Review the sampling method. … Verify the effectiveness of the measurement system. … Confirm the person in charge.More items…•

What is a control plan and why is it used?

A Control Plan is a method for documenting the functional elements of quality control that are to be implemented in order to assure that quality standards are met for a particular product or service. The intent of the control plan is to formalize and document the system of control that will be utilized.

What is a control chart used for?

The control chart is a graph used to study how a process changes over time. Data are plotted in time order. A control chart always has a central line for the average, an upper line for the upper control limit, and a lower line for the lower control limit. These lines are determined from historical data.

What are the 5 elements of a control plan?

What are the 5 elements of a control plan?1.1 Measurements and Specifications.1.2 Input/Output to a Process.1.3 Processes Involved.1.4 Frequency of Reporting and Sampling Methodology.1.5 Recording of Information.1.6 Corrective Actions.1.7 The Process Owner.1.8 Summary.

What are the key elements of a control plan?

Seven attributes to consider when creating a control plan are:1.1 Measurements and Specifications. … 1.2 Input/Output to a Process. … 1.3 Processes Involved. … 1.4 Frequency of Reporting and Sampling Methodology. … 1.5 Recording of Information. … 1.6 Corrective Actions. … 1.7 The Process Owner. … 1.8 Summary.

What is the first step in developing a control plan?

Process Design And Execution: The control plan is built around the central process, and determining appropriate standards for a given process and setting associated performance criteria is the first step in creating a Control Plan.

What are the 3 types of controls?

Three basic types of control systems are available to executives: (1) output control, (2) behavioural control, and (3) clan control. Different organizations emphasize different types of control, but most organizations use a mix of all three types.

What is quality control plan?

Quality Control Plan (QCP) is a written set of procedures and activities aimed at delivering products that meet quality objectives for a project as stated in contract documents and other procedures, manuals, and guidance.